![]() ![]() Even if this time can be shortened, it constitutes a major constraint that is no longer acceptable in urban areas. Good concreting practices require a maturing time of 28 days before applying a load. This can lead to real problems as the limited space available under ground has to be shared by a great many networks (such as gas, sewage, telecommunications and cable networks). The larger the diameter of the pipeline, the bigger the anchor blocks required. Greater freedom in designing networks Phasing out concrete anchor blocksĪnchoring technologies are increasingly taking the place of concrete anchor blocks, which have many drawbacks including their weight and size. Value of coefficient K depending on the type of fitting Hydraulic thrust forces can be very severe and must be counteracted by suitable anchoring devices or concrete anchor blocks. These forces may lead to joint separation on the pipeline unless they are counteracted by using concrete anchor blocks or anchoring devices. Hydraulic thrust forces occur at the location of changes in direction, reductions in diameter ( bends, tees, tapered sections) and at the end of pipelines carrying pressurized fluid. (For other pressures, multiply the pressure in bar by the site test pressure). The table below gives the thrust forces for 1 bar pressure. – or construction of concrete anchor blocks. ![]() These localized thrusts must be counteracted to prevent joint separation: – at any change in direction (bends, tees), Thrust forces occur in a pressurized main: They can be high and must be counterbalanced by appropriate anchored joint systems, or by anchor blocks. Hydraulic thrust forces occur at changes in direction, reductions in diameter (bends, tees, tapers) and at the ends of pipelines carrying water under pressure.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |